Gulf Coast Waste Disposal Authority Blackhawk WWTP Rehabilitation, Friendswood, TX

Gulf Coast Waste Disposal Authority Blackhawk WWTP Rehabilitation, Friendswood, TX

blackhawk-wwtp-resized

Preliminary engineering report for to analyze various treatment plant rehabilitation alternatives with an emphasis on sustainability and total life cycle cost of the plant rehabilitation. Alternatives were developed that reduced overall plant energy consumption by as much as 40 percent and reduced operations and maintenance labor for the plant. Once the alternatives were analyzed, design and construction packages were developed and prioritized, including rehabilitation of the ultraviolet disinfection system and effluent filters, new headworks and aeration system improvements.