 |
|
 |
|
 |
 |
|
 |
| Sienna Plantation Storm Sewer, Houston, Texas |
|
Heights Water Main, Houston, Texas |
|
Wastewater Treatment Program, Houston, Texas |
Northeast Well
Collection Line, Houston |
|
Design
of Southside Utilities, Tomball, Texas |
|
New Solids
Handling Building, Galveston, Texas |
|
|
|
|
|
 |
 |
 |
  |
 |
|
  |
 |
  |
 |
Klotz Associates completed the design of over 8 miles of storm sewer and drainage improvements for an existing neighborhood southwest of Houston. The project scope included replacing roadside ditches with storm sewers and improving the grade on the remaining ditches. Additional, pavement reconstruction and utility adjustments were required as a part of these storm sewer improvements. Features applicable to this project include: The successful design of the storm sewer for this area of Sienna Plantation required innovation to address the needs within the established budget and as required by the area residents. |
  |
|